A person carries a 2.00-N pebble through the path shown in the figure,starting at point A and ending at point B.The total time from A to B is 6.75 min.How much work did gravity do on the rock between A and B?
A) 30.0 J
B) -30.0 J
C) -56.0 J
D) 56.0 J
E) -36.0 J
Correct Answer:
Verified
Q28: How much work would a child do
Q29: A 10-kg dog is running with a
Q30: What is the minimum energy needed to
Q31: When a car of mass
Q32: A 1.0-kg object moving in a certain
Q34: Find the net work done by friction
Q35: A traveler pulls on a suitcase strap
Q36: How much work must be done by
Q37: Matthew pulls his little sister Sarah along
Q38: A child does 350 J of work
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents