The Multi Resource Company manufactures two lines of washing machines, Regular and Deluxe. The contribution margin per unit of a Regular model is $110 and for Deluxe Model is $175. The company has two departments, Assembly and Testing. The Regular Model requires 3 hours to assemble, while a Deluxe Model requires 4 hours. The total time available in Assembly is 12,000 hours. In the Testing Department, it requires 2.5 hours to test a Regular Model and 1.5 hours to test a Deluxe Model. A total of 6,000 hours of testing time is available. Based on this information, the optimum production plan for Multi Resource is:
A) 2,400 Regular Models
B) 3,000 Deluxe Models
C) 1,091 Regular Models and 2,182 Deluxe Models
D) 4,000 Deluxe Models
E) 4,000 Regular Models
Correct Answer:
Verified
Q108: Carter Inc. produces two products, A and
Q109: The shadow price in a linear programming
Q110: In situations when management must decide on
Q111: Apex Manufacturing Corporation is considering a significant
Q112: Quinta Inc. manufactures machine parts for aircraft
Q114: Harrington Corporation produces three products, A, B,
Q115: Copeland Inc. produces product X-547 in a
Q116: Which one of the following is most
Q117: Harrington Corporation produces three products, A, B,
Q118: Quinta Inc. manufactures machine parts for aircraft
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents