Rather than try to adjust the master production schedule to change resource loads, it is more practical to control the flow at each bottleneck or CCR to bring capacities in line.
Correct Answer:
Verified
Q51: Smaller transfer batches give lower work-in-process inventory
Q52: JIT requires work-in-process when used with Kanban
Q53: According to the theory of constraints, throughput
Q54: A way to find a bottleneck is
Q55: The "dollar days" inventory measurement may be
Q57: A synchronous manufacturing system does not have
Q58: Larger transfer batches give shorter lead times
Q59: Transfer batch is another term for process
Q60: According to the theory of constraints, throughput
Q61: In a process sequence where a product