Zero Company's standard factory overhead rate is $3.75 per direct labor hour (DLH) , calculated at 90% capacity = 900 standard DLHs. In December, the company operated at 80% of capacity, or 800 standard DLHs. Budgeted factory overhead at 80% of capacity is $3,150, of which $1,350 is fixed overhead. For December, the actual factory overhead cost was $3,800 for 840 actual DLHs, of which $1,300 was for fixed factory overhead.
Under a three-way breakdown (decomposition) of the total overhead variance, what is the total factory overhead spending variance for Zero Company in December (to the nearest whole dollar) ?
A) N/A—this variance doesn't exist under a three-way breakdown of the total overhead variance.
B) $225 favorable.
C) $425 unfavorable.
D) $560 unfavorable.
E) $600 unfavorable.
Correct Answer:
Verified
Q94: Neptune Inc. uses a standard cost
Q95: Bluecap Co. uses a standard cost
Q96: Neptune Inc. uses a standard cost
Q97: Zero Company's standard factory overhead application rate
Q98: Zero Company's standard factory overhead rate is
Q100: Neptune Inc. uses a standard cost
Q101: The following information is available from
Q102: Megan, Inc. uses the following standard costs
Q103: Gerhan Company's flexible budget for the units
Q104: Megan, Inc. uses the following standard costs
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents