Jim, an efficiency expert, proposes the "just-in-time" inventory method to Roger, the CEO of Neptune Inc. If Roger is to accept the proposal, which of the following changes is he most likely to implement in Neptune Inc.?
A) He is likely to avoid made-for-order method of manufacturing.
B) He is likely to create a larger storage space for inventories.
C) He is likely to introduce processes that support lean production.
D) He is likely to manufacture mass products well ahead of demand.
E) He is likely to stock a backup of supplies for emergency.
Correct Answer:
Verified
Q25: How does lean production differ from "batch
Q34: The final stage in work-flow analysis is
Q34: Which of the following is true of
Q36: Scientific management first sought to identify the
Q38: Which of the following is true of
Q40: Which of the following is required for
Q41: _ provides a cross-sectional overview of the
Q42: Units that are a part of the
Q42: Functional structures are more appropriate than divisional
Q60: _ provides a longitudinal overview of the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents