"Total productive maintenance" is best described as:
A) avoiding all breakdown maintenance
B) doing a great deal of preventative maintenance to try to avoid breakdown maintenance
C) a JIT approach taking advantage of cross-training
D) extending preventative maintenance back to design
E) none of the above
Correct Answer:
Verified
Q27: In the area of maintenance, the Pareto
Q30: The average time before breakdown of a
Q33: Which of the following is the primary
Q34: Reactive maintenance is _ maintenance.
A)Planned
B)After the event
C)Proactive
D)Predictive
E)Preventive
Q35: The type of maintenance which is periodic
Q36: The major approaches used in plans to
Q37: Preventive maintenance is generally scheduled on the
Q70: Which of the following would not improve
Q78: In the broadest sense, equipment and facilities
Q80: Ideally, preventive maintenance will be performed
A)after a
Unlock this Answer For Free Now!