Xero Company's standard factory overhead rate is $3.75 per direct labor hour (DLH) ,calculated at 90% capacity = 900 standard DLHs.In December,the company operated at 80% of capacity,or 800 standard DLHs.Budgeted factory overhead at 80% of capacity is $3,150,of which $1,350 is fixed overhead.For December,the actual factory overhead cost was $3,800 for 840 actual DLHs,of which $1,300 was for fixed factory overhead.Assuming the use of a four-way breakdown (decomposition) of the total overhead variance,what is the variable factory overhead efficiency variance for December?
A) $90 unfavorable.
B) $150 unfavorable.
C) $225 favorable.
D) $425 unfavorable.
E) $650 unfavorable.
Correct Answer:
Verified
Q114: Megan,Inc.uses the following standard costs per unit
Q115: Gerhan Company's flexible budget for the units
Q116: Gerhan Company's flexible budget for the units
Q117: Megan,Inc.uses the following standard costs per unit
Q118: Gerhan Company's flexible budget for the units
Q120: Megan,Inc.uses the following standard costs per unit
Q121: The following information is available from the
Q123: The following information is available from the
Q124: The following information is available from the
Q127: Which of the following would not be
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents