The best method for assigning costs to the baseline under the 50 / 50 rule is to establish frequent checkpoints over the duration of the work package and assign completion percentages in dollar terms.
Correct Answer:
Verified
Q9: A CPI index of 1.11 indicates that
Q10: Baseline costs typically include labor, equipment, materials
Q11: Progress and performance can be measured quantitatively
Q12: Most changes will not result in serious
Q13: Schedule variance measures progress in time units.
Q15: In some cases, conditions or scope can
Q16: An undesirable schedule variance always indicates that
Q17: The PCIC index measures the project percent
Q18: Earned value is defined as the budgeted
Q19: A project control system allows for comparing