Which of the following statements about batch scheduling is INCORRECT?
A) Dispatching is used to determine the job priority at a work center.
B) The priority of a job, once determined, does not change as it progresses through the production process.
C) Finite scheduling in batch systems recognizes the limited processing capacity of the facility and does not allocate more capacity than is available.
D) The theory of constraints argues that scheduling can be improved by increasing capacity at bottleneck operations.
Correct Answer:
Verified
Q21: First come,first served is widely used in
Q22: Starting with a due date and scheduling
Q23: A bottleneck should never be blocked or
Q24: A manufacturer of water filtration pumps is
Q25: If the critical ratio of a job
Q27: Which of the following is a tactic
Q28: Concerning dispatching rules,which of the following is
Q29: The greater the workload on a process,the
Q30: Finite capacity scheduling
A) is an extension of
Q31: The theory of constraints says that
A) queues
Unlock this Answer For Free Now!