The ideal setup time for a lean system is
A) 5 minutes.
B) the time it takes the line to get ready.
C) 0 minutes.
D) 1 hour.
Correct Answer:
Verified
Q1: External setup time refers to
A) the time
Q2: Which of the following statements regarding lean
Q4: Which of the following is NOT a
Q5: Which of the following statements regarding lean
Q6: Which of the following is NOT generally
Q7: Supplier management in a lean system
A) may
Q8: With regards to suppliers,lean systems typically require
A)
Q9: Managing quality in a lean system
A) is
Q10: The time it takes a container to
Q11: Why is a uniform load desirable in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents