What is the NPV of the project using the WACC methodology?
A) $58,028.68
B) $49,613.03
C) $48,300.47
D) $102,727.55
E) None of the above Using the cash flow menu of a financial calculator: CF0 = -$100,000; C01 = $39,800; F01 = 4; C02 = $43,100; I = rWACC = 11.20; NPV = $48,300.47
Correct Answer: