Treasures Company manufactures picture frames of all sizes and shapes and uses a job-order costing system.There is always some spoilage in each production run.The following costs relate to the current run:
Estimated overhead (exclusive of spoilage)
Spoilage(estimeted)
Sules value of spoiled frames $11,500
100,000
The actual cost of a spoiled picture frame is $7.00.During the year 170 frames are considered spoiled.Each spoiled frame can be sold for $4.The spoilage is considered a part of all jobs.
Required:
a. Labor hours are used to determine the predetermine doverheadrate. Whatis the predetermined overhe ad rate per direct labor hour.
b. Prepare the jounal entry needed to record the spoilage.
c. Prepare the iounnal entry if the spoilage relates only to Job#12 rather than being a part of all production runs.
Correct Answer:
Verified
Q156: Sanchez Products has no Work in
Q157: Williams Company
Williams Company has a job-order costing
Q158: Charleston Company
Charleston Company has two departments
Q159: Davis Company
Davis Company uses a job-order costing
Q160: Sloane Products has no Work in
Q162: Dillman Company manufactures custom-built conveyor systems
Q163: Can standard costing be used in job-order
Q164: What is a "job" as defined in
Q165: Discuss actual costing,normal costing,and standard costing.
Q166: What information should be contained in a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents