When the cost of lost units must be assigned,and those same units must be included in an equivalent unit schedule,these units are considered
A) normal and discrete.
B) normal and continuous.
C) abnormal and discrete.
D) abnormal and continuous.
Correct Answer:
Verified
Q61: Process costing techniques should be used in
Q62: A process costing system
A)cannot use standard costs.
B)restates
Q63: Material is added at the beginning of
Q64: The method of neglect handles spoilage that
Q65: A hybrid costing system combines characteristics of
A)job
Q67: Transferred-in cost represents the cost from
A)the last
Q68: The cost of abnormal continuous losses is
A)considered
Q69: The cost of normal discrete losses is
A)absorbed
Q70: A process costing system
Calculates average cost
Q71: Abnormal spoilage can be
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents