Presented below are terms preceded by letters a through j and followed by a list of definitions 1 through 10.Enter the letter of the term with the definition,using the space preceding the definition.
(a)Cost variance
(b)Volume variance
(c)Price variance
(d)Quantity variance
(e)Standard costs
(f)Controllable variance
(g)Fixed budget
(h)Flexible budget
(i)Variance analysis
(j)Management by exception
__________ (1)The difference between the total budgeted overhead cost and the overhead
cost that was allocated to products using the predetermined fixed overhead rate.
__________ (2)A planning budget based on a single predicted amount of sales or production
volume; unsuitable for evaluations if the actual volume differs from the predicted volume.
__________ (3)Preset costs for delivering a product,component,or service under normal
conditions.
__________ (4)A process of examining the differences between actual and budgeted sales or
costs and describing them in terms of the amounts that resulted from price and quantity
differences.
__________ (5)The difference between actual and budgeted sales or cost caused by the
difference between the actual price per unit and the budgeted price per unit.
__________ (6)A budget prepared based on predicted amounts of revenues and expenses
corresponding to the actual level of output.
__________ (7)The difference between actual and budgeted cost caused by the difference
between the actual quantity and the budgeted quantity.
__________ (8)The combination of both overhead spending variances (variable and fixed)
and the variable overhead efficiency variance.
__________ (9)A management process to focus on significant variances and give less
attention to areas where performance is close to the standard.
__________ (10)The difference between actual cost and standard cost,made up of a price
variance and a quantity variance.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q106: Cabot Company collected the following data regarding
Q109: Abrams,Inc.,provides the following results of March's operations:
Q111: Cabot Company collected the following data regarding
Q111: Whistler Company determined that in the production
Q148: Identify the four steps in the budgetary
Q155: What are sales variances? How are they
Q159: Should both favorable and unfavorable variances be
Q160: Flexible budgets may be prepared before or
Q165: How are unfavorable variances recorded? How are
Q180: What is the overhead volume variance? What
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents