Manatee Corp.has developed standard costs based on a predicted operating level of 352,000 units of production,which is 80% of capacity.Variable overhead is $281,600 at this level of activity,or $0.80 per unit.Fixed overhead is $440,000.The standard costs per unit are:
Manatee actually produced 330,000 units at 75% of capacity and actual costs for the period were:
Calculate the following variances and indicate whether each variance is favorable or unfavorable:
(1)Direct labor efficiency variance:
$__________________
(2)Direct materials price variance:
$__________________
(3)Controllable overhead variance:
$__________________
Correct Answer:
Verified
Q126: Falcon Company's output for a period was
Q127: Perkins Company provides the following data developed
Q127: Jacques Company planned to use 18,000 pounds
Q128: Stanton Co.produces and sells two lines
Q129: Job #305 was budgeted to require 3.5
Q130: Big Bend Co.fixed budget for the year
Q131: In producing 700 units of Product CBA
Q134: Use the following cost information to calculate
Q135: Duval,Inc.budgets direct materials at $1/liter and each
Q151: Fairfield Co. collected the following information about
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents