A production kanban card is used to signal that:
A) work is needed at the work center.
B) work is ready to be moved to the next station.
C) a problem exists.
D) a machine has broken down and needs immediate attention.
E) a machine is ready for preventive maintenance.
Correct Answer:
Verified
Q60: Building up an inventory of standard parts
Q61: Which of the following is characteristic of
Q66: The ultimate objective in a lean system
Q69: Which of the following contributes to the
Q82: The Five S's do not include
A)Sort.
B)Straighten.
C)Sanitize.
D)Sweep.
E)Standardize.
Q96: Although lean systems tend to produce standardized
Q100: A basic requirement for operating with the
Q103: The kaizen philosophy applies to
A)employee development.
B)safety stock.
C)waste.
D)supply
Q104: A successful conversion to a lean system
Q118: With regard to suppliers, lean systems typically
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents