The activity controlled in the same way by both kanban and MRP is the determination of:
A) rates of output.
B) products to be built.
C) materials required.
D) capacity required.
E) feedback information.
Correct Answer:
Verified
Q74: Which of the following is not characteristic
Q76: A common objective of both MRP and
Q77: A potential obstacle to conversion to a
Q82: The Four Star Publishing Company uses 60
Q83: Which of the following would not contribute
Q101: When lean is used in the context
Q111: Previously, management calculated the number of kanban
Q114: Process design that supports lean does not
Q115: Having a vendor be responsible for managing
Q117: A system of lights used at each