A quality analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that whenever this process is under control, package weight is normally distributed with a mean of 20 ounces and a standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each: If he uses upper and lower control limits of 22 and 18 ounces, what is his risk (alpha) of concluding this process is out of control when it is actually in control (Type I error) ?
A) 0.0026
B) 0.0456
C) 0.3174
D) 0.6826
E) 0.9544
Correct Answer:
Verified
Q95: The chair of the operations management
Q96: A design engineer wants to construct
Q97: A design engineer wants to construct
Q98: A quality analyst wants to construct
Q99: The chair of the operations management
Q101: Construct the appropriate two-sigma control chart
Q102: The specification limit for a product is
Q104: Organizations should work to improve process capability
Q105: Studies on a bottle-filling machine indicate that
Q107: The specifications for a product are 6
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents