The technique which can be used to estimate the percentage of time a worker or piece of equipment is idle is known as:
A) MTM.
B) work sampling.
C) methods analysis.
D) micro motion study.
E) none of these.
Correct Answer:
Verified
Q151: Which of the following is not characteristic
Q152: A job has a normal time of
Q153: Which is not a requirement for an
Q154: What is the effect of an increase
Q155: In a stopwatch time study, the average
Q157: In a stopwatch time study, adjusting the
Q158: A job had an observed time of
Q159: Which of the following is not an
Q160: A job has an observed cycle time
Q161: A methods and measurements analyst for Timepiece,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents