A methods and measurements analyst needs to develop a time standard for a certain task. In a preliminary study, he observed one of his workers perform this task five times, with the following results: What is the observed time for this task?
A) 80 seconds
B) 84 seconds
C) 160 seconds
D) 240 seconds
E) 400 seconds
Correct Answer:
Verified
Q91: A job has a normal time of
Q92: Standard times derived from a firm's historical
Q94: A methods and measurements analyst needs
Q111: The owner of Touchdown Sports Bar wants
Q143: A technique for estimating the proportion of
Q146: In work sampling, how will increasing the
Q156: The technique which can be used to
Q157: In a stopwatch time study, adjusting the
Q159: Which of the following is not an
Q166: The design of work systems typically involves:
(I)work
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents