Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?
A) If you lose an hour at a bottleneck it is better than making scrap
B) Do not balance capacity,balance the flow
C) Do not allow bottlenecks to govern the flow of the line
D) An hour saved at a bottleneck operation is a mirage
E) A the amount in a process batch should be fixed when the batch is begun and not changed over time or along its route
Correct Answer:
Verified
Q35: Which of the following is one of
Q43: You have run a capacity resource profile
Q44: The synchronous manufacturing approach uses backward scheduling.
Q45: What are the three measurements that give
Q50: What is a word indicating a resource
Q58: Larger transfer batches give shorter lead times
Q59: Transfer batch is another term for process
Q76: Departments within a firm often are at
Q101: According to the theory of constraints, which
Q121: Which of the following is not an
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents