One of the key reasons for a proper interface between design engineering and supply management is:
A) Early supplier involvement can reduce design costs and time to market
B) It reduces conflict on specifications
C) It helps reduce inventory
D) It improves ROI
E) It improves quality
Correct Answer:
Verified
Q32: The effect of different materials on productivity
Q33: The flow of communications between marketing,operations,material control
Q34: In the introductory case at the beginning
Q35: A common conflict of interest between supply
Q36: An independent estimate is usually not cost
Q37: Almost all of the problems present in
Q38: The best way to insure interface with
Q39: Why does supply in non-manufacturing organizations have
Q40: What should be the relationship between supply
Q42: the many internal interfaces of the supply
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents