A bottleneck is:
A) A resource that has the maximum capacity in the facility
B) A resource whose capacity is less than the capacity of all other resources and whose capacity is less than the demand placed on it
C) A resource that blocks labor productivity
D) A resource that has the fastest processing time
Correct Answer:
Verified
Q5: In the language of theory of constraints,inventory
Q7: Aggregate planning and scheduling differ in that:
A)The
Q8: The overriding problem in batch scheduling is:
A)Regulating
Q9: Critical Ratio is:
A)The ratio of processing time
Q9: Which of the following is NOT determined
Q11: Shortest processing time (SPT)rule means:
A)The job with
Q12: Theory of constraints,as it applies to business
Q13: The reason(s)for batch scheduling being a complex
Q14: According to Goldratt:
A)An hour lost at the
Q15: Which of the following is a performance
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents