True/False
Toyota Production System is another term for a lean system.
Correct Answer:
Verified
Related Questions
Q31: According to the lean philosophy,a stable master
Q32: Kaizen events typically take between 1 to
Q33: Takt time is the available time for
Q34: One-touch setups could require as long as
Q43: The Japanese term for waste is "gemba."
Q45: What are the five tenets of lean
Q47: How is the 5 Whys technique used
Q48: Preventive maintenance is another term for stabilizing
Q51: "Gemba" refers to data collection using the
Q52: One of the keys to reducing inventory
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents