PERT and CPM
A) are most valuable when a small number of activities must be scheduled.
B) have different features and are not applied to the same situation.
C) do not require a chronological relationship among activities.
D) have been combined to develop a procedure that uses the best of each.
Correct Answer:
Verified
Q18: A path through a project network must
Q19: A critical activity can be part of
Q20: The length of time an activity can
Q21: Arcs in a project network indicate
A)completion times.
B)precedence
Q22: The main difference between CPM and PERT
Q24: When activity times are uncertain,
A)we assume they
Q25: Activities following a node
A)can begin as soon
Q26: A critical activity is
A)an activity that consumes
Q27: Activities K,M,and S immediately follow activity H,and
Q28: Activities with zero slack
A)can be delayed.
B)must be
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents