The mean of the sample means and the pooled standard deviation of 50 samples of size 10 taken from a production process under control are found to be 225 and 16,respectively.The upper control limit for the chart is:
A) 231.79
B) 240.18
C) 218.21
D) 209.82
Correct Answer:
Verified