The following table shows capacity requirements data for making table tops. Which of the following is TRUE?
A) Overtime is needed in day 1.
B) Capacity exactly meets demand in day 5.
C) All of the excess demand in days 4 and 5 can be shifted to day 3.
D) New machines are needed.
Correct Answer:
Verified
Q2: End item A is made by assembling
Q7: Which of the following is NOT an
Q16: Constant changing of the master schedule and
Q17: A bill-of-materials file contains:
A) Invoices for materials
Q18: An MRP record for a motor is
Q19: Materials requirement planning (MRP) systems are used
Q22: Rough-cut capacity planning does all of the
Q23: The following table shows capacity requirements data
Q26: Advanced planning and scheduling systems:
A)Use logic similar
Q34: Benefits of ERP systems include all of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents