Shell Harbour Productions has two production departments,Assembly and Finishing.The total overhead cost in Assembly is $450?000 and Finishing is $25?000.Assembly is driven by machine hours,and Finishing by labour hours.There are 4000 labour hours and 15?000 machine hours in Assembly,while there are 5000 labour hours and 8000 machine hours in Finishing.
Required:
A.What is the overhead rate per unit for Assembly,and for Finishing?
B.How much overhead is applied to a product that uses 3 labour hours in Assembly and 7 labour hours in Finishing,as well as 9 machine hours in Assembly and 4 machine hours in Finishing?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q51: The Sandal Factory manufactures synthetic sandals
Q52: Hobart Manufacturing has the following overhead
Q53: What is the direct method? What assumptions
Q54: What are the two types of departments
Q55: What are direct departmental overhead costs? Please
Q56: When might the plantwide overhead rate be
Q58: Mudgee Manufacturing has two production departments,Mixing and
Q59: The reciprocal method is superior to the
Q60: Perth Manufacturing has the following overhead
Q61: Barossa Manufacturing has the following overhead
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents