The process within TB Figure 15.1 Bubble 1.0 might be described as follows: Consistent with the value chain concept,the IPP begins with the design of the product and production processes.Activity-based costing can be used to develop estimates of the future cost of producing new products as well as potential cost changes from product or design changes.The entire design process is automated through the use of computer-aided design (CAD)and computer-aided engineering (CAE).With the use of enterprise systems,the electronic designs produced using CAD/CAE become the basis for developing detailed production schedules (bubble 2.0 in TB Figure 15.1)as well as the electronic control of production machines.In addition to the detailed product design,the CAD/CAE process results in several data stores of information that are used later in the IPP:
Refer to TB Figure 15.1.Prepare a Level 1 data flow diagram for the product and production process design process only. 
Correct Answer:
Verified
Q101: The process of exploding the BOM results
Q106: A(n) _ is the assigned location where
Q107: The _ specifies the operations necessary to
Q108: _ data marks the end of the
Q110: The _ describes each work center available
Q111: _ is the accumulation of data on
Q113: Used in conjunction with a perpetual inventory
Q114: A(n) _ is an authorization that identifies
Q115: The _ approach to manufacturing places responsibility
Q117: A(n) _ is a group of similar
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents