Figure 5-14
Deluxe Design Company makes custom furniture. On December 1, there were two jobs in process, Job 683, with a cost of $14,200 and Job 684 with a cost of $23,500. Jobs 685, 686, and 687 were started during the month of December. Data on costs added during the month are as follows:
Overhead is applied to production at the rate of 80% of direct labor cost. Job 685 was completed on December 17. Job 684 was completed on December 21 and the client was billed at cost plus 45%. All other jobs remained in process.
-Refer to Figure 5-14.
Required:
A.) Determine the amount of overhead to apply to each job for the period.
B.) Calculate the cost of work-in-process at the end of the month.
C.) Calculate the cost of finished goods, assuming that finished goods inventory on December 1st was zero.
Correct Answer:
Verified
Q178: Feline Company uses a normal job-order costing
Q179: Figure 5-12.Walter Company uses a job-order costing
Q180: A company has two departments that all
Q181: Figure 5-14
Deluxe Design Company makes custom furniture.
Q182: Wisteria Company provided the following data:
Q184: There are two major types of companies:
Q185: Bower Company manufactures a product in a
Q186: Consider two costing systems, normal costing and
Q187: Figure 5-13.
During February, Alexander, Inc., worked on
Q188: Ski Company produces various types of snow
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents