What defines flexible resources?
A) A change in resource spending will occur only if the demand for a resource drops permanently and exceeds demand enough so the activity capacity will be reduced.
B) Often,resources are acquired in advance for multiple periods and are therefore irrelevant.
C) Decisions often affect multi-period capabilities.
D) If the demand for an activity changes across alternatives,then resource spending will change and the cost of the activity will be relevant to the decision.
Correct Answer:
Verified
Q33: Which of the following represents an accurate
Q34: What is a decision to make a
Q35: Vest Industries manufactures 40,000 components per
Q36: Which of the following costs is irrelevant
Q37: Foster Industries manufactures 20,000 components per
Q39: Is upfront resource spending relevant?
A)No,it is always
Q40: Which of the following would be classified
Q41: The following information pertains to the
Q42: Walton Company manufactures a product with
Q43: Which of the following costs is irrelevant
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents