The following production information for the Murray Manufacturing Company has been gathered for part number AB7 (which is used in the manufacture of one of its products):
• Murray Manufacturing buys part AB7 from a supplier.
• Murray estimates that it will need 5,400 parts this month (which has 30 days).
• Each part costs $6.89,and it costs Murray $750 to place an order for part AB7.
• It takes 8 days to receive an order of part AB7 from Murray's supplier.
• All parts orders are received,inspected,and checked into inventory the same day shipment is received.
• Inventory carrying costs are 20% of the inventory value for the month.
Required:
A.Compute the economic order quantity in units (rounded to the nearest unit)for part AB7.
B.Compute the reorder point (rounded to the nearest unit)for part number AB7.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q102: Data is required from which of the
Q103: Activity-based costing (ABC)systems allocate overhead differently than
Q104: Which of the following is a common
Q105: The following production information has been gathered
Q106: CIM affects manufacturing overhead primarily by
A) increasing
Q108: In a production planning system,the production loading
Q109: Which of the following reports specifies production
Q110: Which of the following is a way
Q111: Which of the following outputs from the
Q112: World Voice is a long-distance telephone service
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents