Which of the following is the correct order of the four steps of tracking product costs?
A) Assign → Accumulate → Allocate → Adjust
B) Accumulate → Assign → Allocate → Adjust
C) Adjust → Allocate → Accumulate → Assign
D) Allocate → Adjust → Accumulate → Assign
Correct Answer: