A person carries a 25.0-N rock through the path shown in the figure, starting at point A and ending at point B. The total time from A to B is 1.50 min. How much work did gravity do on the rock between A and B?
A) 625 J
B) 20.0 J
C) 275 J
D) 75 J
E) 0 J
Correct Answer:
Verified
Q30: What is the minimum energy needed to
Q32: A 1.0-kg object moving in a certain
Q39: An object hits a wall and bounces
Q43: A driver,traveling at 22 m/s,slows down her
Q46: How large a net force is required
Q49: A 100-N force has a horizontal component
Q83: How much work must be done
Q86: A person carries a 2.00-N pebble through
Q88: A 2.0-kg object is lifted vertically through
Q89: How much kinetic energy does a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents