Use this scenario for the following question(s) .
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
-Refer to the scenario above. Without using more than one worker per station, what is the maximum output achievable in the 7.5 hour work day?
A) 1000 units
B) 1800 units
C) 1258 units
D) 415 units
Correct Answer:
Verified
Q57: Define the term service package and describe
Q58: Service operations compete and position themselves in
Q59: An independent study for a graduate student
Q60: In a service blueprint, the line of
Q61: The process design team at a
Q63: Use this scenario for the following
Q64: Name a service business that relies heavily
Q65: Use this scenario for the following
Q66: The table depicts a production line
Q67: Use this scenario for the following
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents