Use this scenario for the following question(s) .
With the backyard poultry craze unleashing a tidal wave of municipal code proposals, Chickenverks is poised to capitalize on the sudden demand for chicken tractors. The portable henhouses they have designed can be assembled in 10 basic steps, each with a required time and predecessor as shown in the table. There are 8 productive hours available in a day and the manufacturer wishes to produce 40 units per hour.
-Refer to the scenario above. What is the theoretical minimum number of stations needed?
A) 3
B) 4
C) 5
D) 6
Correct Answer:
Verified
Q89: Regardless of the number of tasks or
Q90: The maximum allowable time between completions of
Q91: What is the optimal location for
Q92: When designers are considering the ways that
Q93: These three tables show the floor
Q95: The table depicts a production line
Q96: The shorter the required takt time, the
Q97: Consider any collection of tasks to be
Q98: Cycle time is the sum of all
Q99: What is the optimal location for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents