Tierra Plant Services completed a special landscaping job for Choate Company.Tierra uses ABC and has the following predetermined overhead allocation rates:
The Choate project required $1,200 in landscape materials,$700 in direct labor,one design,and 35 plants.
Requirements:
1.What is the total cost of the work done for Choate?
2.If Choate paid $3,900 for the job,what is the operating income or loss?
3.If Tierra desires an operating income of 50% of cost,how much should the company charge for the Choate project?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q96: Flasket,Inc.manufactures water bottles for children.Similar water bottles
Q97: Target cost is calculated by deducting desired
Q98: Which of the following statements is true
Q99: Which of the following is the correct
Q100: Target pricing considers all production costs and
Q102: Which of the following triggers manufacturing under
Q103: List two types of service companies
Q104: Edgar Thompson,a CPA,has a firm in
Q105: A cost management system in which a
Q106: In service companies,activity-based management _.
A)results in more
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents