Irene Manufacturing uses a predetermined overhead allocation rate based on direct labor cost.At the beginning of the year,the company estimated total manufacturing overhead costs at $1,020,000 and total direct labor costs at $820,000.In June,Job 711 was completed.The details of Job 711 are shown below. How much was the cost per unit of finished product? (Round any percentages to two decimal places and your final answer to the nearest cent.)
A) $157.50
B) $197.70
C) $169.70
D) $219.70
Correct Answer:
Verified
Q85: The Carlin Fabrication Plant suffered a
Q86: Davie,Inc.used estimated direct labor hours of
Q87: Venus Manufacturing uses a predetermined overhead
Q88: Felton Quality Productions uses a predetermined
Q89: Jezebel,Inc.completed Job 12 and several other
Q91: Gill Manufacturing uses a predetermined overhead
Q92: Q-dot Manufacturing uses a predetermined overhead
Q93: Doric Agricultural Corporation uses a predetermined
Q94: The Quadrangle Fabrication Plant suffered a
Q98: The journal entry to record allocation of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents