Required crane clearances from power lines is less during transit than during crane operation.
Correct Answer:
Verified
Q82: Hollow pan-type treads are filled on-site with
Q83: Which of the following does not lead
Q84: Which of the following can lead to
Q85: Movement of personnel on a material hoist
Q86: Which of the following is not a
Q88: Why is the length of tag lines
Q89: How is the Failsafe Principle of Redundancy
Q90: Most of the fatalities resulting from two-blocking
Q91: Safety belts and lifelines for personnel on
Q92: It is permissible to move personnel on
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents