The equipment and software Shawn wants to acquire will allow the computers used to design motors to be linked directly to the computer-aided equipment of the factory floor.Shawn is proposing to set up a(n) :
A) Modular manufacturing system.
B) Computer-integrated manufacturing system.
C) E-hub that relies on network software to control the production process.
D) First-in, first-out production system.
Correct Answer:
Verified
Q56: _ means tailoring products to meet the
Q57: The goal of lean manufacturing is to:
A)
Q58: To reduce the cost of holding too
Q59: Dave's Cap Emporium offers to produce hats
Q60: ERP is the acronym for:
A) Educated rights
Q64: Enterprise resource planning (ERP)goes beyond the capabilities
Q66: In a PERT network,the sequence of tasks
Q272: are a set of international standards for
Q286: _ is a technique to analyze and
Q294: Which of the following would be most
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents