Custom Cedar Products (CCP)manufactures a line of outdoor furniture.In November,CCP received an order Outdoor Spaces for six 42 inch diameter tables with umbrella stand.The order from Outdoor Spaces became job 1296 at CCP.A Materials requisition for Job 1296 is presented in the following section.In addition to the materials requisition,The labour time records (partial)or the week that these tables were made are presented.Other products were also being produced during that week,so not all labour belongs to Job 1296,but all labour belonging to Job 1296 is shown.
Requirements:
1.Calculate the total for the Materials Requisition form.Post the information from the Materials Requisition form to the Job Cost Record.
2.Complete the labour time records for each of the employees and post the information to the Job Cost Record for Job 1296.
3.Complete the Job Cost Record.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q43: Which comes first in the flow of
Q44: Custom Cedar Products (CCP)manufactures a line of
Q44: What is the document which is prepared
Q45: Which comes last in the flow of
Q47: For a manufacturer that uses job costing,show
Q48: Payroll costs for factory employees who do
Q52: A document that accumulates job costs is
Q54: Generally accepted accounting principles (GAAP)mandate that manufacturing
Q55: Briefly explain the cost flow of materials
Q67: Manufacturing overhead costs can be directly traced
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents