The standard variable overhead cost rate for Walter Manufacturing is $23 per unit.Budgeted fixed overhead cost is $52,000.Walter Manufacturing budgeted 4,000 units for the current period and actually produced 4,100 finished units.What is the production volume variance?
Assume the allocation base for fixed overhead costs is the number of units expected to be produced.
A) $2,300 favourable
B) $1,300 favourable
C) $2,300 unfavourable
D) $1,300 unfavourable
Correct Answer:
Verified
Q192: Flash Manufacturing gathered the following flexible budget
Q193: The difference between total actual variable overhead
Q195: Strait Corporation uses the following standard costs
Q198: Standard Products Company recognizes variances from standards
Q201: Standard Products Company recognizes variances from standards
Q203: Bolt Industries gathered the following information for
Q216: Tuscany Foods has the following information about
Q228: When a company uses direct materials, the
Q249: Which term below is best paired with
Q253: Which department listed below would most likely
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents