Instruction 18-7
A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor proceeds by randomly sampling five individuals per hour for a period of 10 hours. The sample mean and range for each hour are listed below.
She also decides that lower and upper specification limit for the critical-to-quality variable should be 10 and 30 seconds, respectively.
-Referring to Instruction 18-7,suppose the sample mean and range data were based on six observations per hour instead of five.How would this change affect the lower and upper control limits of an R chart?
A) Both LCL and UCL would remain the same.
B) LCL would remain the same; UCL would decrease.
C) LCL would increase; UCL would decrease.
D) LCL would decrease; UCL would increase.
Correct Answer:
Verified
Q63: Instruction 18-8
A supplier of silicone sheets
Q64: Instruction 18-10
A supplier of silicone sheets
Q65: Instruction 18-9
Recently, a university switched to
Q66: Instruction 18-7
A factory supervisor is concerned
Q67: Instruction 18-7
A factory supervisor is concerned
Q69: Instruction 18-11
Recently, a university switched to
Q70: Instruction 18-10
A supplier of silicone sheets
Q71: Instruction 18-10
A supplier of silicone sheets
Q72: Instruction 18-8
A supplier of silicone sheets
Q73: Instruction 18-10
A supplier of silicone sheets
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents