Multiple Choice
A worker lifts a 20.0-kg bucket of concrete from the ground up to the top of a 20.0-m tall building.The bucket is initially at rest,but is traveling at 4.0 m/s when it reaches the top of the building.What is the minimum amount of work that the worker did in lifting the bucket?
A) 3.92 kJ
B) 400 J
C) 560 J
D) 4.08 kJ
E) 160 J
Correct Answer:
Verified
Related Questions
Q25: Block A (0.40 kg)and block B (0.30
Q26: A graph of the force on an
Q27: In the figure,two identical ideal massless springs
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents