Consider the EOQ model with planned shortages,as presented in Sec.18.3 of the textbook.Suppose,however,that the constraint S/Q = 0.8 is added to the model,where Q is the order quantity and S is the inventory level just after a batch of Q units is added to inventory.Derive the expression for the optimal value of Q,using the result for this model that the total cost per unit time is ,where d is the demand rate,K is the setup cost,c is the unit cost of ordering,h is the unit holding cost,and p is the unit shortage cost.
Correct Answer:
Verified
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents