What is used as the basis for management to make a "go/no go" decision regarding whether to proceed from the physical design phase to the implementation planning and conversion phase of the SDLC?
A) a conceptual system design report
B) a physical systems design report
C) a systems design report
D) an implementation planning design report
Correct Answer:
Verified
Q24: Which consideration is not of concern in
Q25: Flowcharts,record layouts,decision tables,and related items are part
Q26: An implementation plan consists of the various
Q28: Several types of documentation must be prepared
Q30: The physical design stage of the SDLC
Q31: Control design considerations are important to the
Q34: Which consideration listed below applies to file
Q37: At what point in the systems development
Q48: Step-by-step reviews of procedures or program logic
Q78: _ is the process of installing hardware
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents