The second step in the production cycle is planning and scheduling.One of the methods of production planning is referred to as pull manufacturing.This method is also known as
A) manufacturing resource planning (MRP) .
B) just-in-time manufacturing system (JIT) .
C) the economic order quantity (EOQ) system.
D) ahead-of-time production implementation (ATPI) .
Correct Answer:
Verified
Q1: The document that authorizes the removal of
Q4: The production planning department develops the master
Q5: The operations list shows
A)the labor and machine
Q5: The basic activities in the production cycle
Q6: Information found on the materials requisition form
Q7: What document authorizes the manufacturing of a
Q8: The list which specifies the labor and
Q9: A master production schedule is used to
A)develop
Q10: The form in the production cycle that
Q11: Whether a company uses an AIS,ERP,or incorporates
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents