A manufacturing firm is able to produce 2,000 pairs of shoes per hour, at maximum efficiency. There are three eight-hour shifts each day. Production is actually 1,600 pairs of shoes per hour due to unavoidable operating interruptions. The plant is expected to run every day but was only able to operate for 27 days in September. What is the theoretical capacity for the month of September?
A) 1,488,000 shoes
B) 1,440,000 shoes
C) 1,036,800 shoes
D) 1,296,000 shoes
E) 1,152,000 shoes
Correct Answer:
Verified
Q1: Answer the following question(s)using the information below.A
Q3: _ provides the lowest estimate of denominator-level
Q3: The Canada Revenue Agency requires companies to
Q4: A major reason for choosing _ utilization
Q6: Betts Wrench Company manufactures socket wrenches. For
Q9: Normal capacity utilization is not the same
Q12: Theoretical capacity is based on which of
Q16: Practical capacity is based on which of
Q142: Normal capacity utilization is the expected level
Q155: Determining the "right" level of capacity is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents