Solved

Florian Plant Services Completed a Special Landscaping Job for Pierre

Question 83

Essay

Florian Plant Services completed a special landscaping job for Pierre Designs Company.Florian uses ABC and has the following predetermined overhead allocation rates:
 Predetermined Overhead  Activity  Allocation Base  Allocation Rate  Designing  Number of designs $275 per design  Planting  Number of plants $15 per plant \begin{array}{llc}&& \text { Predetermined Overhead } \\\text { Activity } & \text { Allocation Base } &\text { Allocation Rate }\\\hline \text { Designing } & \text { Number of designs } & \$ 275 \text { per design } \\\text { Planting } & \text { Number of plants } & \$ 15 \text { per plant }\end{array} The Pierre Designs project required $1,200 in landscape materials,$700 in direct labor,one design,and 35 plants.
Requirements:
1.What is the total cost of the work done for Pierre Designs?
2.If Pierre Designs paid $3,900 for the job,what is the operating income or loss?
3.If Florian desires an operating income of 50% of cost,how much should the company charge for the Pierre Designs project?

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents