Irene Manufacturing uses a predetermined overhead allocation rate based on a percentage of direct labor cost.At the beginning of the year,the company estimated total manufacturing overhead costs at $1,000,000 and total direct labor costs at $830,000.In June,Job 711 was completed.The details of Job 711 are shown below. How much was the cost per unit of finished product? (Round any percentages to two decimal places and your final answer to the nearest cent. )
A) $80.00
B) $101.58
C) $85.20
D) $111.20
Correct Answer:
Verified
Q54: In a manufacturing operation,depreciation of plant equipment
Q59: Specialty Wood Products,Inc.had the following manufacturing
Q60: Norman Manufacturing reports the following data
Q62: Jezebel,Inc.completed Job 12 and several other
Q63: Venus Manufacturing uses a predetermined overhead
Q64: Archangel Manufacturing calculated a predetermined overhead
Q65: Jeremy Corporation estimated manufacturing overhead costs for
Q66: Arabica Manufacturing uses a predetermined overhead allocation
Q66: Doric Agricultural Corporation uses a predetermined
Q76: Aaron,Inc.estimates direct labor costs and manufacturing overhead
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents